Case Study: NovaLiner 12

LATERAL REHABILITATION, EASTERN IRRIGATION DISTRICT, ALBERTA, CANADA 
AquaMaster Canal Liner Geomembrane

Preparing the canal for geosynthetic / geomembrane liner 

The Details 

  • Type of project: Installation of a fabricated canal liner – 5 miles per year 
  • Size of project: 1,350,000 ft² (125,000 m²) of AquaMaster® NovaLiner™ 12 black/black geomembrane liner
  • Fabricator: Inland Plastics or Layfield Environmental Systems
  • Contractor/Installer: Eastern Irrigation District (EID)

The Background 

The EID performs several projects annually on the infrastructure that they operate and this is a typical example. Lands adjacent to lateral 11B Springhill were being adversely affected by alkali contamination. The cause was water mounding.

Installing NovaLiner 12 geomembrane canal liner

The Challenge

Installation could not commence until after the summer irrigation season was over, which typically ends in mid-October. At this time of the year, frost and severe winter weather can occur. Due to those conditions, the installation needed to be fast and the material flexible enough to permit easy installation in cold weather. IPG® was able to meet all the requirements of the project with its AquaMaster NovaLiner 12.

The Solution

The vegetation in the old canal was removed and the sides and bottom of the canal were re-graded to one (1) foot below design grade. Sheets of AquaMaster NovaLiner 12 were placed in the channel and anchored in place using trenches on top of the banks. The liner was then covered with one (1) foot of armour gravel. For this project 42 panels 60' x 360' and 20 panels 45' x 500' were used, making it a quick and simple installation. Each panel weighed less than 1,000 lbs and was easily deployed by the crew. The design did not require field seaming, therefore panels were overlapped three (3) feet, backfilled and compacted which further shortened the installation time and eliminated the need of seam quality control on site.

Learn more about IPG’s AquaMaster products: Call 1-800-565-2000 or visit itape.com/aquamaster.



Friday, June 8, 2018

Case Study: NovaLiner 24

EAGLE FORD FRESHWATER FRAC POND, TILDEN, TEXAS 

Installation of AquaMaster geosynthetic pond liner

The Details 

The Background 

Eagle Ford Frac Water needed a durable containment liner to hold 2,000,000 barrels of fresh water for two Frac drills on-site. The excess water in pond is available for drilling companies in area to purchase for drilling or other needs as well.

The Challenge

With average annual rainfall at approximately 23 inches, water in the Eagle Ford shale is very scarce and in high demand. The general contractor hired a drilling company to tap 4000 feet into the aquifer to fill the Frac pond with brackish water for 2 on-site drilling rigs and to sell excess water to Oil and Gas companies in the area. Choosing a tough, durable lining system along with the best fabricator/installer was of the utmost importance to ensure that minimal water was lost after installation.

The Solution

Frac pond complete! NovaLiner 24 geomembrane
was installed in 12 hours! 
AquaMaster NovaLiner 24 was chosen due to its proven performance in puncture and hydrostatic resistance and ease of installation. BTL was able to factory fabricate five panels, 162' x 369' each (59,778 SF), and have rolls arrive and placed for deployment before mobilization. As the panels where deployed only four field seams were required saving valuable time and minimizing the need for quality control testing of field seams. 92% of the seams were done in the controlled environment of the installer’s factory, ensuring perfect seam quality. Installation was completed in 12 hours over 1 ½ days - fast installation was crucial due to variable high winds in the area that can gust up to 30 mph.

Learn more about IPG’s AquaMaster products: Call 1-800-565-2000 or visit itape.com/aquamaster.



Wednesday, June 6, 2018

Case Study: NovaLiner 24

OKLAHOMA DEPARTMENT OF TRANSPORTATION PROJECT

The Details 

  • Type of Project: Construction of a 7-mile stretch of road along I-35 near Ardmore, Oklahoma
  • Size of Project: Approximately 630,000ft² of AquaMaster® NovaLiner™ 24 geomembrane liner
  • Traffic Information: Heavy traffic (I-35 is a major highway running North and South)
  • Duration: Approximately 2 years
Roadways expand and contract due to underlying moisture

The Challenge 

I-35 is a major highway running North & South from Laredo, Texas all the way up to Duluth, Minnesota. A seven mile stretch of the highway near Ardmore, Oklahoma is prone to undulations in the pavement, owing to expansive clay beneath the road surface. As the moisture content of the clay increases the clay tends to swell, which causes a non-homogenous expansion and contraction.

This area (known as the Ardmore basin) experiences frequent changes in moisture content depending on weather conditions and the situation is compounded by wild temperature variations between 0˚F in the winter (-18˚C) and 110˚F (43˚C) in the summer.

These undulations have a detrimental effect to the road surface and as a consequence, the I-35 has required several repairs in this area since its construction in the late 1960’s.

Stabilizing the road base with geosynthetics 

The Solution

Because I-35 is a heavily travelled major roadway for both passenger vehicles and heavy trucks, the Oklahoma Department of Transportation was looking for a long term solution to maintain the problem soils that had necessitated multiple repairs over the years. The use of a moisture barrier, to control the swelling in the clay subgrade, was ultimately selected based on the principle that by shielding the clay, the geomembrane would minimize the opportunity for significant moisture changes in the pavement subgrade.

AquaMaster® NovaLiner 24 exceeded the original specification and had several cost advantages over alternative materials. It was selected as the premier geomembrane because of its:

✔ Strength properties
✔ Water impermeability
✔ Lighter weight
✔ Portability
✔ Puncture resistance
✔ Soil stabilization on slopes
✔ Cost savings

Design Involved

To maximize moisture control AquaMaster geomembrane was laid down on a base of lime stabilized subgrade and would be covered with a layer of crushed stone. Continuously reinforced concrete pavement with a drainable base were placed upon the crushed stone.

NovaLiner 24 Geomembrane provided in prefabricated panels
The geomembrane was brought to the site in prefabricated panels that were between 48’ to 60’ wide and 200’ long and covered approximately 630,000 SF. The panels were heat seamed together to ensure a water tight membrane. The use of prefabricated panels ultimately saved time and money by reducing the number of seams that had to be welded in the field.

Learn more about IPG’s AquaMaster products: Call 1-800-565-2000 or visit itape.com/aquamaster.



Thursday, May 31, 2018

Case Study: NovaLiner 20

PRINCE WILLIAM COUNTY LANDFILL, MANASASS, VIRGINIA
Aquamaster Landfill Cover

The Details 

  • Type of project: Installation of a fabricated landfill cover 
  • Size of project: 338,400 FT² (31,438 M²) of Intertape Polymer Group® AquaMaster® NovaLiner 20 Black/White geomembrane liner 
  • Fabricator: Colorado Lining Inc. (CLI) 
  • Contractor: RM Sonderquist 
  • Installer: Hallaton, Inc. 
A durable landfill cover was needed

The Background 

Prince William County needed a durable cover for a landfill project that would be able to stand up to the harsh conditions over two years of exposure.

The Challenge

The municipality had a very rigid specification that required extensive testing and supporting documentation in order to demonstrate the long term viability of using an AquaMaster® product in such an application.

The Solution

By working closely with the fabricators, contractors and installers, IPG was able to offer the NovaLiner 20 which met the rigid requirements of the job site plus offered a 2-year warranty required by the project specification. With CLI able to fabricate and supply custom fitted panels to the installer enabling Hallaton, Inc. to seamlessly place the material in an efficient manner and time.

The end result was a product placed in the field that had cost advantages over alternative materials and offered exceptional:

✔ Strength properties
✔ Performance properties
✔ Longevity
✔ Puncture resistance
✔ Chemical resistance

Learn more about IPG’s AquaMaster products: Call 1-800-565-2000 or visit itape.com/aquamaster.